General:

  • University children hospital "Tiršova 2", Belgrade, Serbia
  • Investor: Public Investment Office
  • Partner: Conventus Consultants d.o.o.

Highlights:

  • Area: cca 67.000 sqm
  • Transformer substation 2x2000kVA, 2 DG sets 1250kVA each, 1+MW UPS installed power
  • 10 operating theaters
  • 2000 sqm of intensive care units
  • Dedicated SCADA for power supply control system
  • Medical transformers, insulation monitoring, etc.

Our scope:

Design for construction permit (PGD) and Design for construction (PZI):

Transformer substation design

LV design:
  • Main LV power supply –cables and cable trays
  • Lighting installations
  • Emergency lighting installations
  • Small power installations
  • Earthing and equipotential bonding installations
  • Lightning installations

ELV installations (ELV)
  • Fire alarm system
  • Access control system
  • Structured Cabling System
  • Gas detection system
  • Public address
  • CCTV system
  • Intercom system
  • WiFi system
  • IP TV and telephony
  • Digital signage system
  • Conference system
  • SOS system
  • Nurse call system
  • Specific systems for operating theaters

BIM - REVIT - LOD 300