Log Design d.o.o. delivered three MCCs in Mining and smelting basin RTB Bor, in cooperation with company Energotehnika Južna Bačka from Novi Sad.
Location
- Transformer substation TS-1000 - reconstruction
Highlights
- Logstrup system Omega
- form of separation 4b type 6 acc. BS
- WDU-A & MDU drawer units with Profibus communication
- switchboards with rear access
- switchboards with protection devices: ACB, DOL, VSD/VFD
Our scope
- MCC (Motor Control Center), rated current of 2000A
- form 4b, type 6 acc. to BS
- MCC with rear access for cables
- drawer units WDU-A and mini drawer units MDU with Profibus communication
- 11 panels overall
Location
- The new power plant in Mining and smelting basin RTB Bor
Highlights
- Logstrup system Omega
- form of separation 4b type 6 acc. BS
- WDU-A & MDU drawer units
- MCCs with front cables access
- MCCs with protection devices: ACB, MCCB, VSD/VFD
Our scope
- MCC (Motor Control Center), rated current of 1250A
- form 4b, type 6 acc. to BS
- MCC with rear access for cables
- drawer units WDU-A and mini drawer units MDU
- 6 panels overall
LocationTransformer substations TS-4,5,6 reconstruction in Mining and smelting basin RTB Bor
Highlights
- Logstrup system Omega
- form of separation 4b type 6 acc. to BS
- WDU-A & WDU-E & MDU drawer units with Profibus communication
- MCC with front access
- MCC with protection devices: ACB, DOL
Our scope
- MCC (Motor Control Center), rated current of 800A
- form 4b, type 7 acc. to BS
- MCC with front access
- WDU-A & MDU drawer units with Profibus communication
- 4 panels overall