Galenika – pharmaceutical production plant

Belgrade, Serbia

Galenika – pharmaceutical production plant

General:

  • Galenika – pharmaceutical production plant, Belgrade, Serbia
  • Investor: GALENIKA a.d. Beograd, Batajnički drum bb, Zemun, Beograd
  • Partner: BWK ENGINEERS doo

Highlights:

  • Area: cca 14.560 sqm
  • Transformer substation 10/0.4 kV, 2x2000kVA
  • 2 transformers, 4 MVA installed power
  • 2xDG set: 1.825 MVA and 1.675 MVA
  • Clean rooms
  • Building constructed in 1990s, now is done renovation and finalization

Our scope:

Design for construction permit (PGD) and Design for construction (PZI):

Transformer substation design

LV installations design:
  • Main LV power supply –cables and cable trays
  • Lighting installations
  • Emergency lighting installations
  • Small power installations
  • Earthing and equipotential bonding installations
  • Lightning installations
ELV installations design:
  • Fire alarm system
  • Access control system
  • Structured Cabling System
  • Gas detection system
  • Public address
  • CCTV system