The new CCH is designed to offer the maximum of flexibility and the greatest possible functionality. Many halls can be enlarged or reduced in size as needed, and parallel events can be accommodated almost without limitations. As a stage for the world, the CCH will once again set standards within the international convention scene. With its all-new forecourt area and its daylight-flooded entrance hall rising as tall as the main building, the CCH will surprise visitors with a totally new experience. All this right in the center of Hamburg, with an ICE high-speed train station right at the doorstep.
General:
- CCH – Congress Center Hamburg, Germany
- Contractor: M&P group GmbH, Hamburg, Germany
- Area: cca 36.000 sqm
Highlights:
- Congress center reconstruction
- Very high demands for LV & ELV systems
Our scope:
Designing and modelling for Execution design (LPH 5):Transformer substations design
LV installations design (440):
- Main LV power supply –cables and cable trays
- Lighting installations
- Emergency lighting installations
- Small power installations
- Earthing and equipotential bonding installations
- Lightning installations
- KNX (EIB) installations
ELV installations design (450):
- Fire alarm system
- Access control system
- Structured Cabling System
- Gas detection system
- Public address
- CCTV system
- Intercom system
- WiFi system
- IP TV and telephony
- Digital signage system
BIM - REVIT - LOD 400