At the end of October we have commisioned roof top PV plant on the MTU Maintenance d.o.o. building in Nova Pazova. PV plant has installed power of 1.137kWp. This project we have realized based on the "turn key on" principle.
Some figures related to this project:
  • PV plant installed power: 1.137 kWp
  • 2054 pcs. of PV panels HT-SAAE HT18X T 555W
  • ISOTEC D13 mounting system
  • 12 pcs. of PV invertors Sungrow (SG110CX and SG50CX-P2)
  • 5 pcs. of AC distribution boards equipped with Siemens devices
  • 9 pcs. of DC distribution boards equipped with Siemens surge arresters and fuse switch disconnectors